| Other Branch Availability |
|---|
Isolator w/ Rotating Flange & Multi-Function Drain, Full Port Forged Brass Uni-Flange Ball Valve, w/ Detachable Rotating Flange, Multi-Function Hi-Flow Hose Drain, Adjustable Packing Glands, Nuts & Bolts.
NIBCO® Ball Valve, Series: 4141 Series, 1 in Nominal, IPS x Flanged Connection, Full Port, 600 psi WOG, 2-15/16 in Inlet to Outlet Length, 2-5/8 in Top to Inlet Center, Brass Body, PTFE Seat, Brass Stem, PTFE Seal, Brass Packing, Steel Handle, Brass Ball, 100 deg F, Domestic/Import: Import
| Ball Material | : | Brass |
| Body Material | : | Brass |
| Connection Type | : | IPS x Flanged |
| Domestic/Import | : | Import |
| Handle Material | : | Steel |
| Inlet to Outlet Length | : | 2-15/16 in |
| Nominal Size | : | 1 in |
| Packing Material | : | Brass |
| Port Type | : | Full |
| Pressure Rating | : | 600 psi WOG |
| Seal Material | : | PTFE |
| Seat Material | : | PTFE |
| Series | : | 4141 Series |
| Stem Material | : | Brass |
| Temperature Rating | : | 100 deg F |
| Top to Inlet Center | : | 2-5/8 in |